Contact Us

Use the form on the right to contact us.

You can edit the text in this area, and change where the contact form on the right submits to, by entering edit mode using the modes on the bottom right. 

Form Block
This form needs a storage option. Double-click here to edit this form, and tell us where to save form submissions in the Storage tab. Learn more
         

123 Street Avenue, City Town, 99999

(123) 555-6789

email@address.com

 

You can set your address, phone number, email and site description in the settings tab.
Link to read me page with more information.

Fund-A-Need 2026

2025 Fund-A-Need


New Kitchen & Serving Area

At Saint Bede Academy, the refectory has long been a place where students gather, connect and build community. Now, through the 2026 Fund-A-Need initiative, Saint Bede is taking the next step in strengthening student life with a complete modernization of the Academy’s kitchen facilities.

This transformation will create a modern culinary hub designed to prioritize student health, food safety, efficiency and service quality - empowering staff to prepare and serve nutritious meals with great speed, confidence and care.

A Modern Kitchen Designed for the Future

The new commercial kitchen will feature an integrated design that seamlessly connects kitchen operations with the student refectory and boarding student dining rooms, improving the entire process from preparation to plate.

The redesigned space will utilize the historic cloister as a transitional corridor and incorporate new exit doors from the refectory to the serving area, significantly enhancing the flow and efficiency of student lunch service while honoring the architectural heritage of Saint Bede.

With a layout engineered for functionality and speed, meals will be delivered fresher, faster and more efficiently, creating a better dining experience for every student.

Project Timeline

To minimize disruption to student life, the project will be completed in phases.

  • Infrasture work will begin immediately upon full funding.

  • Equipment installation will take place during summer breaks.

  • Full completion is targeted for July 2027.

Together, We Build the Future

The Saint Bede community is already rallying behind this transformational effort.

$543,000 Already Committed

Project Goal: $994,000

Fund-A-Need Goal: $200,000

Momentum is building, but construction cannot begin until the full amount is secured. Your gift to the 2026 Fund-A-Need does more than modernize a kitchen - it strengthens the daily experience, health and well being of every student who calls Saint Bede home.

Together, we can bring this vision to life.

Donors of $500 or more will be invited to a special Appreciation Party: A Celebration of Gratitude & Giving.

Help us preserve the past, enhance the present and invest in the future!

Questions?

Please contact Superintendent Eve Postula

Email: epostula@st-bede.com